幕墙结构 —— Facade System


Project:  
The Oriental Art Center Year: 2003
Duty:  
collaborative design   Phase: construction drawing design
Architect:  
Paul Andreu    
Project Description:

上海东方艺术中心坐落于浦东行政文化中心,是上海的标志性文化设施之一,由上海市政府和浦东新区政府投资11亿元兴建,法国著名建筑师保罗安德鲁设计, 总建筑面积近40,000平方米。从高处俯瞰,东方艺术中心五个半球体依次为:正厅入口、演奏厅、音乐厅、展览厅、歌剧厅,外形宛若一朵美丽的“蝴蝶兰”。

整体夜景图

局部细节图

 

 

Project:  
The Suzhou International EXPO Center Year: 2003
Duty:  
collaborative design   Phase: tend phase
Architect:  
SOM (Phase 1)    
Project Description:

苏州国际博览中心地处中国-新加坡合作的苏州工业园区CBD核心区域,南临中国最大的城市内湖-金鸡湖,风景秀丽,环境优美。苏州国际博览中心整体像一把巨扇,优雅清新,气势磅礴。

苏州国际博览中心占地面积18.86万平方米,总设计建筑面积25.5万平方米,拥有世界一流水平的配套设施,可承接国际、国内大型展览会、会议和活动,可提供世界上最大的不间断展览空间。成为苏州、江苏、长三角地区重要的进出口贸易窗口和经济技术合作平台、商务活动中心和时尚生活展示中心。

 

 

Project:  
黄石体育馆地下超市入口 Year: 2010
Duty:  
design   Phase: construction drawing design
Architect:  
中国建设上海设计研究院    
Project Description:

黄石体育馆旁边为地下超市,地下超市的主入口位于广场上,主入口罩棚采用钢结构玻璃幕墙。罩棚几何形状为半椭圆放样曲面和大地平面交接形成的曲面。

罩棚钢结构采用曲面单层网壳体系,网壳分为经向梁、纬向梁和封口梁。经向梁和纬向梁构成了单层网壳结构;所有经向梁和纬向梁连接于混凝土地环梁上;封口梁位于网壳开口处,构件截面较大,起到了网壳开口处横隔的作用。所有网壳构件之间采用焊接刚接节点。。

111

罩棚透视图1

222

罩棚透视图2

 

 

 

 

 

 

公共建筑(空间结构) —— Public building ( spatial)


Project:  
Dubai Racing Club - The crescent Roof Year: 2008
Duty:  
collaborative design   Phase: construction drawing design
Architect:  
TAK    
Project Description:

迪拜跑马场为迪拜酋长国新的跑马场项目,用于赛马比赛,包括主看台、酒店、停车场等部分。

跑马场透视效果图

跑马场夜景图(项目实景)

 

 

Project:  
黄石体育馆(钢结构) Year: 2009
Duty:  
design   Phase: construction drawing design
Architect:  
中国建设上海设计研究院    
Project Description:

黄石市体育馆位于黄石市经济技术开发区的中心。基地东面是黄石市广电中心和风景秀丽的磁湖,北面紧邻人民广场和市行政中心,西面是城市商务区,南面是黄石理工学院和居住区。黄石体育馆所处的地理位置得天独厚,非常优越。


体育馆建设用地面积35560平方米,是集中心主体育馆、运动员训练馆、配套体育健身场所以及综合商业为一体的大型综合体育馆。体育馆地下一层、地上三层,其中地下一层为运动员训练馆、体育健身场所和大型超市,一层以上为中心主体育馆。最多容纳座位数量6188座,建筑高度33.71米,总建筑面积40858平方米。 体育馆可以举办地区性比赛和单项全国赛事,除能满足各类正式体育比赛的要求外,还能兼顾开展综合文艺演出、群众性娱乐健身以及大型商贸展览等活动。

 

黄石市体育馆造型新颖美观,是城市的标志性建筑,立面设计充分吸收黄石的基本城市特征和历史文化积淀,并充分考虑基地的环境特征。体育馆造型是从铜晶体中提炼造型元素,立面形成晶体切割的造型,共切割成43个面,分为25个铝板幕墙实面和18个玻璃幕墙虚面。

 

黄石市体育馆主体呈圆形,主体结构形式下部为钢筋混凝土框架结构体系,上部钢结构屋盖采用空间单层折板式三向斜交网格结构,最大跨度为86米,实际结构高度为26.721米,钢结构投影面积为8231平方米,展开面积为14726平方米。屋面钢结构主要分为五个部分:屋面脊线主梁、墙面脊线主梁、屋面板片次梁、墙面板片次梁和树状支撑。

体育馆鸟瞰图(效果图)

体育馆立面图

黄石-3

主体钢架构施工图

黄石-4

局部细节图

 

 

 

 

 

 

 

 

 

 

 

 

公共建筑(多高层) —— Public building ( High-Rise)


Project:  
Maydan Grate Tower Year: 2008
Duty:  
collaborative design (Group Work)  Phase: tend phase
Architect:  
TAK    
Project Description:

A landmark of Medan district of Dubai, High-rise building.

 

MGT is a building group, consisting of 4 single buildings: South Tower, North Tower, Sky Court and North mechanical car park (excluded in preliminary design).

 

The South Tower consists of Tower A and Tower B, with Tower A being straight and Tower B curved. The South Tower has 59 effective storeies and the maximum height is 330m. The overall width of the structure (steel column) is 41.4m, so the depth-width ratio is 330/41.4=7.97, which satisfies the construction detail requirement of super high-rise building. The longitudinal length is 162m, and the longitudinal rigidity is 2-3 times of the transverse one.

 

The North Tower consists of Tower C and Tower D, with Tower C being straight and Tower D curved. The North Tower has 44 effective storeies and the maximum height is 242.5m. The overall width of the structure (steel column) is 39.1m, so the depth-width ratio is 242.5/39.1=6.2, which satisfies the construction detail requirement of super high-rise building.

 

The Sky Court, whose bottom is 6 storeys (28.8m) higher than the ground, is 5 storeies high with a clover shaped hole in the middle. The Sky Court is supported by the 12 steel columns outside the four towers. The support spacing is approximately 70~75m, so the ratio of rise to span is 75/22.5=3.33, meeting the limitation of vertical rigidity.

 

 

 

Project:  
SM商业二期(12#、13#楼) Year: 2011
Duty:  
Project Leader Phase: construction drawing design
Architect:  
中国建筑上海设计研究院    
Project Description:

本项目由高层及多层组成,本次设计的为12#、13#楼。两楼都分为高层主楼和多层裙楼,功能是商业和办公。12#主楼地下2层,地上14层,高79.0m;13#主楼地下2层,地上28层,高97.2m。结构均为框剪结构。

12#1

12#楼透视图1

12#2

12#楼透视图2

13#1

13#楼透视图1

13#2

13#楼透视图2

 

 

 

Project:  
SM商业二期(3#、4#、7#、8#楼) Year: 2011
Duty:  
Project Leader Phase: tend phase
Architect:  
中国建筑上海设计研究院    
Project Description:

项目基地形状规则,分为四个独立的地块,3#、4#、7#、8#地块,分别新建3#楼、4#楼、7#楼、8#楼各一栋,均为高层建筑。总占地面积为33001平方米。总建筑面积239324平方米。
本项目地上4栋高层建筑3#楼、4#楼、7#楼、8#楼其业态分布情况:3#、7#楼裙房为百货,主塔楼为商务办公;4#楼、8#楼裙房为商业,主塔楼商务办公;整个项目地下室连为一个整体,地下共三层,主要功能为一层局部设商铺及步行街,其它均为设备用房和地下车库,地下二层、三层考虑人防设计。

结构均为框剪结构。其中8#主楼高度为177.55米。

3#.

3#楼透视图

7#

7#楼透视图

8#

8#楼透视图

whole

3#4#7#8#地块鸟瞰图

 

 

 

 

 

 

民用建筑—— Civil building


Project:  
三江一期(两个单元,三个单体) Year: 2009
Duty:  
collaborative design  Phase: construction drawing design
Architect:  
中国建筑上海设计研究院    
Project Description:

黄石三江共和新城,混凝土框架和框剪结构。

项目鸟瞰图

项目立面图

 

 

Project:  
嘉兴圣堡园(高层住宅) Year: 2010
Duty:  
collaborative design  Phase: construction drawing design
Architect:  
中国建筑上海设计研究院    
Project Description:

嘉兴圣堡园,高层住宅,混凝土剪力墙结构。

111

项目立面图1

222

项目立面图2

 

 

Project:  
嘉兴圣堡园(别墅住宅) Year: 2010
Duty:  
collaborative design  Phase: construction drawing design
Architect:  
中国建筑上海设计研究院    
Project Description:

嘉兴圣堡园,欧式别墅,混凝土框架结构。

111

别墅单体图

222

别墅群渲染图

 

 

 

Project:  
泰州久源(尚郡住宅小区 一期) Year: 2011
Duty:  
Project Leader   Phase: construction drawing design
Architect:  
中国建筑上海设计研究院    
Project Description:

混凝土剪力墙高层结构,局部多层商业,带地下车库。

111

鸟瞰图

222

透视图1

111

透视图2

111

入口大门

 

 

 

 

 

 

 

 

 

工业建筑 —— Industrial Construction


Project:  
工业厂房 Year: 2005-2007
Duty:  
design   Phase: construction drawing design
Architect:  
     
Project Description:

在美联期间,负责方案设计中标两亿元以上,主持设计过20多个工业钢结构项目,近25万平米,包罗了各种结构形式,其中不乏重特大工业项目。工业钢结构的设计经验丰富,方案能力很强,基本可以做到业界最优。另外还参与和负责了许多技术研发,为美联现有的技术体系作出很大的贡献。 

SEW—传动设备(广州)有限公司

新洲印刷有限公司

广东美的制冷设备有限公司

欧瑞莲化妆品(中国)有限公司

 

 

 

 

Powered By Z-Blog 1.8 Walle Build 91204 Code detection by Codefense

Copyright 缪六华-Liuhua Miao. Some Rights Reserved.